Flap Construction

flap1.jpg (104907 bytes) Construction of the flaps were the easiest of all the control surfaces................right up to the part where the fabrication of the brackets for the actuators began. I'm sure glad that part is over with!!
   
flap2.jpg (83652 bytes) A shot of the top skin being fitted and final drilled.
   
flap11.jpg (92888 bytes) Sitting in the jig just after being final riveted together
   
   
   
   
   
   
   

Back